Cleanroom Ceiling Panels Manufacturer

Glostar manufactures cleanroom ceiling panels and modular cleanroom ceiling systems for pharmaceutical, biotechnology, electronics, semiconductor, food processing, laboratory, medical and other controlled environments. Our cleanroom ceiling panels are available with rock wool, magnesium oxide composite, aluminum honeycomb, PU/PIR and other project-specific constructions. 

Trusted by 1000+ Clients

CE ISO

Choose the Right Cleanroom Ceiling Panels for Your Project

Glostar provides cleanroom ceiling panels and modular ceiling systems for pharmaceutical, biotechnology, semiconductor, electronics, food processing and laboratory facilities. Available with rock wool, MGO composite, aluminum honeycomb and PU/PIR cores, our ceiling panels can be customized to match your cleanroom layout, support system and project specifications.
We support contractors, EPC companies and project owners with customized panel dimensions, coordinated openings for HEPA filters, FFUs and lighting, technical drawings and project-based manufacturing.

Cleanroom Ceiling Panels
Cleanroom ceiling panels coordinated with lighting, air filtration and service openings for an integrated ceiling system.

What Are Cleanroom Ceiling Panels?

Cleanroom ceiling panels are prefabricated enclosure components used to form the overhead boundary of controlled environments such as pharmaceutical cleanrooms, biotechnology facilities, semiconductor plants, electronics manufacturing areas, food processing rooms and laboratories.

Unlike conventional suspended ceilings, a cleanroom ceiling works as part of an integrated enclosure system. Ceiling panels, supporting structures, joints and service openings need to coordinate with cleanroom walls, HEPA filters, fan filter units (FFUs), lighting, sprinklers, access hatches and other building services.

A typical cleanroom ceiling panel consists of metal facings combined with an insulated or structural core. Depending on project requirements, core materials may include rock wool, MGO composite, aluminum honeycomb, PU/PIR and other engineered configurations.

The appropriate ceiling panel should be selected according to fire requirements, ceiling span, support spacing, panel weight, thermal performance, maintenance requirements, cleaning procedures and equipment openings.

Cleanable Ceiling Surfaces

Smooth metal surfaces and carefully designed joints help create a cleanable overhead enclosure. Surface materials and coatings should be selected according to the facility’s cleaning agents, disinfectants, humidity and operating conditions.

Coordinated Openings

HEPA filters, FFUs, lights, sprinklers and access hatches should be coordinated with the ceiling layout before panel fabrication. Prefabricated openings can reduce unnecessary site cutting and improve installation efficiency.

Maintenance Ceiling Access

Not every cleanroom ceiling panel is designed to support personnel. Where maintenance access is required, the complete ceiling assembly — including panels, reinforcement, supports and connections — should be designed and verified for the specified loads.

Three Types of Cleanroom Ceiling Panels by Glostar

Cleanroom ceiling panels are available in different constructions to meet the requirements of cleanroom layout, installation method, ceiling support system and service integration. The appropriate panel type depends on the project scale, module dimensions, required openings, maintenance access and technical specifications. Glostar provides prefabricated, machine-made and customized cleanroom ceiling panels for pharmaceutical, electronics, semiconductor, food processing, laboratory and other controlled-environment projects.
Prefabricated Cleanroom Ceiling Panels

Prefabricated Cleanroom Ceiling Panels

Prefabricated cleanroom ceiling panels are manufactured according to approved project dimensions and ceiling layouts. Panel size, core material, facing, edge details, reinforcement and service openings can be coordinated before production.

For projects involving HEPA filters, FFUs, lighting, sprinklers or access hatches, prefabrication can help reduce unnecessary cutting and modification during site installation.

These panels are particularly suitable for cleanroom projects with customized ceiling layouts, multiple service openings or specific interface requirements.

Machine-Made Cleanroom Ceiling Panels

Machine-Made Cleanroom Ceiling Panels

Machine-made cleanroom ceiling panels are suitable for projects requiring standardized panel dimensions and repetitive ceiling layouts.

Continuous manufacturing can provide consistent panel dimensions and efficient production for larger cleanroom areas. Depending on the selected panel construction, different core materials and metal facings can be combined to meet project requirements for thermal insulation, fire performance and surface finish. For ceiling applications, the panel construction should always be reviewed together with support spacing, suspension arrangement and required loads rather than simply using specifications intended for wall panels.

Cleanroom Ceiling Infill / Blank Panels

Cleanroom ceiling infill/ blank panels are used to close non-equipment areas within modular ceiling grids, particularly in layouts incorporating FFUs, HEPA filters, lights and other ceiling-mounted equipment.

The dimensions of the infill panels should match the selected ceiling grid and equipment modules. Joint sealing, panel retention, maintenance access and equipment support should also be coordinated during design.

Infill panels can also provide flexibility for future cleanroom modifications where ceiling equipment layouts may change.

Match the panel to the ceiling support system

Discuss the supporting structure, suspension points and service coordination with your design team before freezing the panel schedule.

Concealed-support panel ceilings

Review the panel edge profile, suspension connection, perimeter support and installation sequence. Define where access is required and how penetrations are reinforced and sealed.

Grid-supported ceiling layouts

Coordinate the panel module with the grid geometry and each light or filtration unit. T-grid, I-grid, Z-grid and FFU-grid descriptions refer to support approaches; they do not establish equivalent load capacity or universal compatibility.

Cleanroom Ceiling Panels

Need access above the room?

State the maintenance activity, access frequency and equipment weight. Ask for an engineered access solution and supporting documentation; do not treat every sandwich panel as a walking surface.

Compare Core Materials for your ceiling specification

The core material influences the weight, rigidity, thermal insulation, fire-related performance and installation requirements of a cleanroom ceiling panel.

There is no single core material suitable for every cleanroom ceiling. The appropriate construction should be selected according to the ceiling support system, span, service openings, maintenance requirements, operating environment and project specifications.

Glostar provides multiple cleanroom ceiling panel configurations for pharmaceutical, semiconductor, electronics, food processing, laboratory and other controlled environments.

Cleanroom ceiling panel core selection: project review guide
Core construction Selection focus Confirm for the ceiling
Rock wool Projects with defined fire and acoustic requirements Complete assembly test evidence, panel weight, support spacing and edge closure
PU / PIR Projects with thermal performance requirements Exact foam formulation, fire evidence, facing and joint compatibility
Magnesium oxide composite Composite build-ups requiring detailed material review Board specification, moisture conditions, facing protection and assembly weight
Aluminum honeycomb Projects considering a honeycomb construction Bonding system, reinforcement, surface finish and documented ceiling performance
Cleanroom_Double Layer Ceiling Grid System

Specify the assembly, not only the core

The same core can be used in different panel constructions. Faces, adhesives, edge profiles, reinforcement and support details all need to match the proposed use. Ask for documents tied to the exact configuration being quoted.

Cleanroom Ceiling Panel Specifications

SpecificationAvailable Options / Project Requirements
Product Typeلوحة سقف غرفة نظيفة
Core MaterialRock Wool / MGO Composite / Aluminum Honeycomb / PU / PIR
Panel ThicknessCustomized according to ceiling system
Panel WidthStandard or project-specific
Panel LengthCustomized according to ceiling layout
Facing MaterialPre-painted Steel / Stainless Steel / Customized
Surface FinishSmooth / Project-specific coating
ColorWhite / Off-white / Customized
Ceiling OpeningsHEPA / FFU / Lighting / Sprinkler / Access Hatch
ReinforcementAccording to span, opening and load requirements
Support SystemGrid-supported / Concealed support / Project-specific
ApplicationPharmaceutical / Semiconductor / Electronics / Food / Laboratory
CustomizationDimensions / Openings / Facing / Core / Reinforcement

Cleanroom ceiling panel specifications should be confirmed according to the complete ceiling design rather than selected from a single standard dimension.

Panel thickness, module size, core material, metal facing, reinforcement and support spacing can affect the performance of the finished ceiling assembly. Projects incorporating HEPA filters, FFUs, lighting, sprinklers or access hatches also require coordinated openings and support details.

For customized projects, provide your reflected ceiling plan (RCP), cleanroom layout, BOQ or panel schedule. Glostar can review the available information and prepare a project-based cleanroom ceiling panel configuration for further technical evaluation and quotation.

Panel dimensions

Provide the module width, length, ceiling area and reflected ceiling plan. Coordinate dimensions with transport, handling and the service layout.

Thickness & build-up

State the preferred overall thickness, core, metal facing and any reinforcement. Final construction must be reviewed for ceiling use.

Facing & finish

Specify metal type, coating, color and appearance. Provide cleaning chemicals, concentrations and exposure conditions for compatibility review.

Supports & loading

Provide support spacing, suspension arrangement, equipment loads and access requirements. Require documented limits for the selected assembly.

Joints & sealing

Coordinate panel-to-panel joints, perimeter connections, sealant or gasket selection, and details around penetrations.

Fire & thermal requirements

Identify the applicable project requirements and requested evidence. Distinguish core classification from assembly fire resistance.

Openings & services

Schedule FFUs, HEPA housings, lights, sprinklers and hatches. Include each opening size, position, frame and load-support responsibility.

Quantity & delivery

Send the bill of quantities, project country, destination, requested delivery window and packaging or unloading constraints.

Have a ceiling drawing or bill of quantities?

Send your layout with the ceiling area, room use and maintenance-access requirement. Use the review to identify missing interfaces before comparing panel quotations.

Cleanroom Ceiling Panels by Application

Different industries require different cleanroom ceiling configurations. Air distribution, cleaning procedures, equipment density, humidity, maintenance access and regulatory requirements can all influence the selection of ceiling panels and support systems.

Glostar provides customized cleanroom ceiling panels for pharmaceutical, semiconductor, electronics, food, laboratory and other controlled-environment projects.

Pharmaceutical & Biotechnology Cleanroom Ceiling Panels

Pharmaceutical and biotechnology facilities require cleanroom ceilings that support contamination control, cleaning and coordinated installation with filtration and building services. Ceiling surfaces, joints and penetrations should be designed to create a cleanable enclosure while coordinating HEPA filters, lighting, sprinklers and access requirements. For pharmaceutical projects, the ceiling system should be evaluated together with cleanroom walls, HVAC, pressure control, doors and other enclosure components. The ceiling panel alone does not determine GMP compliance or cleanroom classification. Glostar can manufacture customized ceiling panels and coordinated openings according to project layouts and technical specifications.

Food Processing & Cosmetics Cleanroom Ceiling Panels

Food processing and cosmetics facilities may require ceiling surfaces that can withstand frequent cleaning, humidity and exposure to process conditions. Surface materials and coatings should be selected according to cleaning methods, chemicals, temperature and moisture conditions. Attention should also be given to ceiling penetrations, perimeter sealing and condensation risks, particularly in production areas with temperature or humidity differences. Customized cleanroom ceiling panels can be coordinated with lighting, ventilation and other services according to the hygienic requirements of the facility.

Laboratory & Medical Cleanroom Ceiling Panels

Laboratories and medical controlled environments can have very different ceiling requirements depending on room function, cleanliness requirements, equipment and maintenance procedures.

Cleanroom ceiling panels provide smooth overhead enclosure surfaces and can be integrated with filtration, lighting, sprinklers and service openings.

For environments exposed to frequent disinfection or specific chemicals, facing materials and coatings should be selected according to the actual cleaning procedure.

The complete ceiling design should also consider service density, access requirements and interfaces with cleanroom walls, doors and windows.

Modular Cleanroom Ceiling Systems

Modular cleanrooms benefit from coordinated wall and ceiling components that can be prefabricated according to a defined room layout.

Cleanroom ceiling panels can be manufactured to match modular wall systems, doors, windows and equipment interfaces, helping reduce unnecessary site modification.

For projects requiring future expansion or layout changes, modular ceiling systems can also provide greater flexibility when service modules and panel dimensions are planned appropriately.

Early coordination of ceiling grids, filtration, lighting and access requirements can simplify installation and future maintenance.

Resolve these installation interfaces before production

The installation method must follow the approved project drawings and the selected system instructions. Use the following sequence as a coordination checklist.

01 · Confirm the layout

Freeze room dimensions, panel joints and the reflected ceiling plan. Identify obstructions and available suspension points above the room.

02 · Coordinate services

Agree filter, light and access-hatch positions with the MEP team. Define support responsibilities and maintenance clearances for each component.

03 · Approve construction details

Review suspension, perimeter, joints and penetrations. Confirm the ceiling access policy and applicable design documentation.

04 · Organize delivery

Confirm panel identification, packing sequence and site storage. Protect faces, edges and core materials during handling.

05 · Install & inspect

Check alignment, fastening and sealing against approved details. Record deviations and obtain design review before changing openings or supports.

06 · Complete handover

Document the installed arrangement and access restrictions. Coordinate enclosure checks with the cleanroom commissioning and testing plan.

Cleanroom Ceiling Panel Manufacturing & Quality Control

Cleanroom ceiling panel quality affects panel dimensions, surface appearance, joint consistency, installation accuracy and the overall performance of the cleanroom enclosure.

For project-based production, Glostar manufactures cleanroom ceiling panels according to confirmed specifications, drawings and project requirements. Panel construction, dimensions, facing materials, core materials, edge details, reinforcement and prefabricated openings should be reviewed before production.

Panel Construction Review

Before production, confirm the complete panel configuration rather than only the core material or thickness.

The review should include panel dimensions, core material, metal facing, surface finish, edge profile, reinforcement, joint details and required openings.

For customized ceiling projects, HEPA filters, FFUs, lights, access hatches and other service openings should be coordinated with the reflected ceiling plan before fabrication.

Dimensional & Appearance Inspection

Inspection requirements can be agreed according to the project and supplied panel configuration.

Typical inspection items may include panel dimensions, thickness, surface condition, flatness, edge quality, opening dimensions, protective film, panel identification and packaging.

For international cleanroom projects, consistent panel identification can also help contractors organize materials according to the installation sequence.

Shandong Aishijin Biopharmaceutical Cleanroom Project

Project Documentation

Technical documents should correspond to the actual product configuration being supplied.

Depending on the project requirements, buyers may request product specifications, drawings, joint details, material information and applicable test reports.

Where fire, structural or other performance documentation is required, confirm that the test configuration and scope are relevant to the proposed ceiling assembly.

Packaging for International Projects

Cleanroom ceiling panels should be protected during loading, transportation and site storage to reduce damage to surfaces, edges and joint profiles.

Packaging requirements can be coordinated according to panel dimensions, shipment method and project installation sequence.

For large international projects, panel marks and packing lists can also help contractors identify materials and organize installation on site.

Cleanroom Ceiling Panel Solutions for B2B Projects

Cleanroom ceiling panel requirements vary according to the buyer’s role in the project. Contractors may focus on installation and ceiling coordination, EPC companies need to integrate multiple engineering systems, while procurement teams often evaluate specifications, documentation, pricing and delivery.

Glostar supports project-based cleanroom ceiling panel supply for contractors, EPC companies, distributors, procurement teams and industrial project owners.

For cleanroom contractors

For cleanroom contractors, accurate panel dimensions, coordinated openings and clear installation details are important for keeping installation on schedule.

Glostar can manufacture cleanroom ceiling panels according to approved ceiling layouts, panel schedules and technical specifications. Openings for HEPA filters, FFUs, lighting, access hatches and other services can be coordinated before production according to project requirements.

Panel identification, drawings and packing information can also support material organization and installation on international projects.

Suitable for: Cleanroom contractors, installation companies and specialist cleanroom subcontractors.

For Cleanroom EPC Companies

Cleanroom ceiling systems often need close coordination between architectural design, HVAC, MEP services, filtration equipment, lighting and fire protection.

Glostar can support EPC companies by reviewing cleanroom ceiling layouts and panel requirements before production. Panel modules, service openings, interfaces and enclosure components can be coordinated according to the available project information.

For projects requiring complete cleanroom enclosure supply, ceiling panels can also be coordinated with cleanroom wall panels, doors, windows and related accessories.

Suitable for: Pharmaceutical EPC projects, electronics factories, semiconductor facilities, food plants and advanced manufacturing projects.

Cleanroom panel distributors

Distributors often need flexible cleanroom ceiling panel configurations for different industries and local project requirements.

Glostar provides multiple core materials, facing options, panel constructions and customized dimensions. Technical information and project quotation support can be provided according to the inquiry.

For project-based orders, distributors can send customer drawings, BOQs or specifications for further evaluation.

Suitable for: Cleanroom product distributors, building material importers and regional suppliers.

For Cleanroom Project Owners

Project owners need to balance cleanroom performance, installation schedule, maintenance requirements and project investment.

Glostar can help review cleanroom ceiling panel configurations according to the facility application, cleaning environment, ceiling layout, filtration arrangement and technical requirements.

For new facilities and cleanroom renovation projects, wall panels, ceiling panels, doors and windows can also be coordinated as part of the overall cleanroom enclosure.

Suitable for: Pharmaceutical manufacturers, semiconductor companies, food producers, laboratories, medical facilities and industrial facility owners.

What Affects Cleanroom Ceiling Panel Prices?

There is no universal cleanroom ceiling panel price per square meter because the final cost depends on the panel construction, ceiling system, service openings, order quantity and project delivery requirements.

For B2B projects, quotations should be compared according to the same technical specification and supply scope.

Core Material & Panel Construction

Rock wool, MGO composite, aluminum honeycomb and PU/PIR panels have different material structures and manufacturing requirements.

Panel thickness, facing material, coating, reinforcement and edge construction also influence the final cost.

Ceiling Support System

The total ceiling package may include more than panels.

Grid profiles, concealed supports, suspension components, perimeter trims and connection accessories can affect the overall project cost.

Always confirm which components are included in the quotation.

Quantity & Customization

Larger standardized orders may have different production economics from small projects requiring multiple customized panel dimensions and openings.

The quantity, panel schedule and degree of customization should therefore be confirmed when requesting a quotation.

Packaging & Shipping

For international projects, panel dimensions, packaging method, container utilization, destination and shipping terms can affect the delivered project cost.

Special packing or panel identification requirements should also be discussed before quotation.

Clean Room Wall Panel FAQs

The main difference is that cleanroom ceiling panels are designed for controlled environments where cleanability, sealing, service integration and contamination control are important considerations. Conventional suspended ceilings are primarily used to create an interior ceiling finish and conceal building services. Cleanroom ceilings must additionally coordinate joints, perimeter connections, filtration equipment, lighting, penetrations and other interfaces. Surface finish, joint design, ceiling support, service openings and cleaning requirements should therefore be evaluated as part of the complete cleanroom ceiling system.

A cleanroom ceiling panel is one component, while a cleanroom ceiling system includes the panels together with the supporting structure, suspension components, profiles, connections, sealing details and integrated services.

Depending on the project, the complete system may include:

Cleanroom ceiling panels

Ceiling grid or concealed support structure

Suspension components

Perimeter profiles

HEPA filters or FFUs

Lighting

Sprinklers

Access hatches

Sealing accessories

When comparing quotations, buyers should confirm whether the supplier is quoting only the panels or a larger ceiling-system package.

There is no single core material that is suitable for every cleanroom ceiling project.

Rock wool is commonly considered where fire performance is an important requirement. MGO composite constructions can be considered where additional rigidity and composite construction are required. Aluminum honeycomb provides a lightweight structure with good rigidity and panel flatness, while PU/PIR provides high thermal insulation performance relative to its thickness.

The appropriate core material should be selected according to fire requirements, ceiling span, panel weight, thermal performance, support arrangement, service openings, maintenance requirements and project specifications.

For technical evaluation, the complete panel construction should be considered rather than the core material alone.

Cleanroom ceiling panel thickness should be selected according to the complete ceiling design rather than by using a single standard value for every project. The required thickness can depend on: Core material Panel dimensions Support spacing Ceiling span Reinforcement Service openings Thermal requirements Maintenance requirements Specified loads A thicker panel does not automatically provide a walkable or higher-load ceiling. If you are unsure which thickness is appropriate, provide the reflected ceiling plan, panel dimensions, support arrangement and required performance so the complete ceiling configuration can be evaluated.

Not all cleanroom ceiling panels are walkable.

Whether personnel can access a cleanroom ceiling depends on the complete engineered ceiling assembly, including panel construction, facing materials, reinforcement, panel span, support spacing, suspension system, connections and the required concentrated or distributed loads.

Panel thickness alone should not be used to determine whether a ceiling is safe for personnel access.

If maintenance staff need access above the cleanroom to service HEPA filters, FFUs, lighting or other equipment, the required maintenance loads and access method should be defined during project design.

The complete ceiling assembly should be verified for the specified loads before personnel access is permitted.

A walkable cleanroom ceiling is an engineered ceiling assembly designed to support specified personnel or maintenance access loads while maintaining the required cleanroom enclosure. A walkable ceiling is not simply a thicker cleanroom sandwich panel. Its performance depends on the interaction between ceiling panels, reinforcement, supporting profiles, suspension points, connections and structural design. Walkable cleanroom ceilings are often considered where maintenance personnel need regular access to equipment located above the cleanroom, such as filters, ductwork, lighting or utilities. The required load conditions and access method should be clearly specified before the ceiling system is selected.
Cleanroom ceiling panels can be supported by different grid, profile or concealed-support systems depending on the ceiling design. The support arrangement should consider panel dimensions, ceiling span, panel weight, equipment openings, suspension points and required loads. In some projects, panels are installed within a modular ceiling grid. Other projects may use concealed supports or project-specific suspension systems. The ceiling panel and support system should always be evaluated together because changing support spacing can affect the performance requirements of the panels and the complete ceiling assembly.

Yes. Cleanroom ceiling panels can be coordinated with openings for HEPA filters, fan filter units (FFUs), lighting and other ceiling-mounted services.

The position and dimensions of these openings should preferably be defined on the reflected ceiling plan before panel fabrication.

For each opening, the project team should consider framing, reinforcement, sealing, equipment support and maintenance clearance.

Where possible, prefabricating coordinated openings can reduce unnecessary cutting and modification during installation.

For semiconductor and electronics cleanrooms with high FFU coverage, the ceiling grid, equipment modules and infill panels should be coordinated as one integrated system.

Yes. Cleanroom ceiling panels are widely used as part of enclosure systems for pharmaceutical and biotechnology controlled environments.

For pharmaceutical applications, ceiling surfaces and joints should be selected with consideration for cleanability, sealing, cleaning procedures and integration with HEPA filtration, lighting, sprinklers and other services.

However, a ceiling panel alone does not make a facility GMP compliant.

GMP compliance depends on the complete facility design, materials, HVAC system, pressure control, construction quality, qualification, cleaning procedures and operation.

The ceiling panel specification should therefore be selected according to the project’s applicable requirements and complete cleanroom design.

Cleanroom ceiling panels can be used as part of facilities designed for different ISO cleanliness classes, including ISO Class 5, ISO Class 7 and ISO Class 8 environments. However, ISO cleanliness classification applies to the controlled environment as a whole, not to an individual ceiling panel. The final cleanliness level depends on factors such as air filtration, airflow, air-change strategy, room pressure, sealing, ceiling and wall interfaces, doors, penetrations, operating procedures and contamination-control practices. The role of the ceiling system is to provide an appropriate overhead enclosure that can be integrated with the complete cleanroom design.

ISO 14644 primarily addresses cleanrooms and associated controlled environments rather than providing a universal product certification for individual cleanroom ceiling panels.

For this reason, buyers should be cautious with statements such as “ISO Class 5 certified ceiling panel” without understanding what has actually been tested or certified.

Cleanroom classification is determined at the room or facility level according to applicable procedures and operating conditions.

For ceiling panel procurement, review the product specification, materials, surface characteristics, joint design, project requirements and relevant supporting documentation rather than relying on an isolated “ISO-certified panel” claim.

Yes. Cleanroom ceiling panels can be used for new construction, renovation, extension and partial ceiling replacement projects.

Renovation projects usually require additional site verification because new panels may need to interface with existing ceiling grids, supports, walls, HVAC equipment and building services.

Before manufacturing replacement panels, verify the existing module dimensions, panel edges, support arrangement, service openings and connection details.

Where possible, provide existing drawings together with current site measurements and photographs.

This information helps determine whether standard panels can be used or customized replacement panels are required.

Get an Instant Quote

نموذج الاتصال

Request Your Cleanroom Ceiling Panel Quote

Tell us about your ceiling area, application and project location. Include “cleanroom ceiling panels” in your message so the inquiry can be directed to the right product discussion.

Have drawings to share?

Email your layout and panel schedule with the project name. Include any specified loading, finish and documentation requirements.

Tell us about your project

نموذج تذييل الصفحة الرئيسية

احصل على عرض أسعار فوري​

نموذج الاتصال

تحديد موعد اجتماع​

تفضلوا بزيارة جناح شركة «جلوستار» في معرض كانتون الـ140، في الفترة من 23 إلى 27 أكتوبر 2026، الجناح رقم 13.1K26.
تنزيل النموذج
شعار Glostar

أنت مدعو

معرض كانتون

2026

تفضلوا بزيارتنا في

الجناح 13.1K26

حلول متكاملة لمواد البناء

تعرّف على «غلوستار»

تعرّف على شركة «جلوستار» في معرض كانتون في دورته الـ140

اكتشف حلول غلوستار المتكاملة لغرف الأبحاث، بما في ذلك ألواح الجدران والأسقف الخاصة بغرف الأبحاث، والأبواب، والنوافذ، وأنظمة غرف الأبحاث المعيارية.

تعرّف على فريقنا في قوانغتشو لمناقشة مشاريعك القادمة في مجالات الصيدلة والإلكترونيات وغرف الأبحاث الصناعية.

متى

23–27 أكتوبر 2026

أين

قوانغتشو، الصين

كشك
13.1K26
دعونا نناقش مشروع البناء القادم الخاص بك.
تم حظر هذا المحتوى لأنه كان سيتصل بموقع يوتيوب.

احصل على عرض أسعار فوري​

نموذج الاتصال